Method for producing nitro compound

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9561998
APP PUB NO 20160318846A1
SERIAL NO

15107872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nitro compound represented by formula (1) which is a raw material for producing a compound represented by formula (7) can be produced by reacting at least one type selected from the group consisting of a compound represented by formula (2), a compound represented by formula (3), and a compound represented by formula (3′) with a compound represented by formula (4). [In the formula, R1, R2, R3, and R4 are each independently a hydrogen atom, etc., X1 and X2 are each independently a chlorine atom, etc., R6, R7, R8, and R9 are a hydrogen atom, etc., provided that X1, X2, R6, R7, R8, and R9 are not all the same, X3, X4, and X5 are a halogen atom, R10 is a nitro group, etc., R5 is an alkyl group having 1 to 12 carbon atoms, etc., and M is an alkali metal atom.]

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUMITOMO CHEMICAL COMPANY, LIMITED

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nagashima, Yuta Osaka, JP 6 0
Toriumi, Tatsuya Takarazuka, JP 5 2
Yoshimoto, Yuya Takarazuka, JP 7 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00