Method of forming a solder bump on a substrate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9520375
SERIAL NO

14700420

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a solder bump on a substrate includes: forming a conductive layer(s) on the substrate having a surface on which an electrode pad is prepared; forming a resist layer on the conductive layer(s) having an opening over the electrode pad; forming a metal pillar in the opening of the resist layer, wherein the metal pillar includes a first conductive material; forming a space between sidewalls of the resist layer and the metal pillar; forming a metal barrier layer in the space and on a top surface of the metal pillar, the metal barrier layer including a second conductive material that is different from the first conductive material of the metal pillar; forming a solder layer on the metal barrier layer over the top surface of the metal pillar; removing the resist layer; removing the conductive layer(s); and forming the solder bump by reflowing the solder layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Toyohiro Yokohama, JP 49 87
Mori, Hiroyuki Yasu, JP 394 3155
Orii, Yasumitsu K Higashiomi, JP 2 5
Toriyama, Kazushige Kyoto, JP 25 171
Yamamichi, Shintaro Kunitachi, JP 90 2228

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00