Valve mechanism for controlling a fluid, in particular an abrasive high-viscosity material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10697560
APP PUB NO 20160327183A1
SERIAL NO

15109837

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a valve mechanism (1; 1′) for controlling a fluid, comprising a housing (2; 2′) that has a fluid duct (3), further comprising a valve body (5) that is mounted on the housing (2) so as to be adjustable between an open position in which the valve body allows the fluid (F) to flow through the fluid duct (3) and a closed position in which the valve body fluid-tightly seals the fluid duct, and comprising a membrane-like sealing element (13) which is secured to the housing (2) at a first end portion (14) and to the valve body (5) at a second end portion. In the open state of the valve body (5), a side of the sealing element (13) that faces away from the fluid duct (3) rests against a wall section (17) between the two end portions (14, 15).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BINDER GMBH89081 ULM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Binder, Robert Laichingen, DE 32 467

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00