Circuit arrangement for the generation of a bandgap reference voltage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10019026
SERIAL NO

14996684

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit for generating a bandgap voltage includes a circuit module for generation of a base-emitter voltage difference, the circuit module including a pair of PNP bipolar substrate transistors which identify a first current path and a second current path. A first current mirror of an n type is connected between the first and second branches and is further connected via a resistance for adjustment of the bandgap voltage to the second bipolar transistor. A second current mirror of a p type is connected between the first and second branches, and connected so that the current mirrors repeat current of each other. In operation to generate the bandgap voltage, current flows from the supply voltage to ground only through said the first and second bipolar substrate transistors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • STMICROELECTRONICS S.R.L.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiricosta, Mario Tremestieri Etneo, IT 16 54
Ippolito, Calogero Marco Aci Castello, IT 21 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00