Power state transition analysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10067551
APP PUB NO 20160328002A1
SERIAL NO

15214030

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Technologies for analyzing power state transitions of a processor of computing device including determining, by the computing device, a power state entered by the processor of the computing device and a duration of the power state entered based on power state records, wherein the power state records comprise transition data indicative of transitions of a processor of the computing device between power states. The computing device further determines an accuracy of a power state selection of the processor of the computing device based on the determined power state entered and target residency data for the processor. The target residency data identifies, for each power state of a plurality of power states of the processor, an amount of time required in the corresponding power state to result in a conservation of power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORP.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knight, Robert P Mahomet, US 6 249
Lim, Min Yeol Champaign, US 3 17
Sharma, Neha Mountain View, US 73 377
Upadhyaya, Gautam Champaign, US 4 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00