Air conditioner and compressor protection circuit thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9780555
APP PUB NO 20160329699A1
SERIAL NO

15110099

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioner and a compressor protection circuit thereof are provided. When overcurrent occurs in a phase current of a compressor, an overcurrent level signal is output by a voltage comparison module, and is latched and output to an intelligent power module by a signal latching module, and the intelligent power module shuts off the output of the phase current according to the overcurrent level signal, so as to achieve the overcurrent protection of the compressor; and subsequently, a conventional level signal is output to the signal latching module by the voltage comparison module, the signal latching module keeps outputting the overcurrent level signal, and outputs the conventional level signal until a latching cancel signal output by a signal processing circuit is received, so that the intelligent power module starts the output of the phase current, thereby enabling the compressor to normally operate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIDEA GROUP CO LTDBEIJIAO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bao, Diansheng Guangdong, CN 1 0
Chen, Jianchang Guangdong, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00