Electrochemical reactor for producing oxyhydrogen gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10329675
APP PUB NO 20160333487A1
SERIAL NO

15114845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns an electrochemical reactor or modular unit designed to obtain a pure gas mixture of hydrogen and oxygen through the water electrolysis process. The electrochemical reactor includes a containment cabinet that is defined by four walls which form a prismatic cube with a base, and it is open at its upper surface. Within it, a number of conductive or semi-conductive plates are housed in parallel and insulated from each other, connecting all the cells by means of soldered electric connection, located at the ends of the cube, as well as other devices used for the dehumidification of gas and the refrigeration of condensed water. Its internal configuration is designed to allow for easy replenishment of water, while maintaining the isolation of the cells during operation. The abovementioned electrolysis occurs inside the cube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DELGADO RODRIGUEZ LUIS ALFONSOZAPOPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Delgado, Rodriguez Luis Alfonso Zapopan, MX 2 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00