Transfer roller, encapsulating glue film coating system, and method of encapsulating the glue film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10610886
APP PUB NO 20160339468A1
SERIAL NO

14785657

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An encapsulating glue film coating system and a transfer roller thereof, and a method of forming an encapsulating glue film are provided. The encapsulating glue film coating system comprises: a support platform configured to carry a display panel to be encapsulated; a glue liquid storage device configured to provide a glue liquid; a glue liquid input device mounted on the support platform and configured to receive the glue liquid from the glue liquid storage device; and a transfer roller configured to receive the glue liquid from the glue liquid input device. The transfer roller is configure to transfer glue liquid to a coating roller and comprises: a roller body; an absorbing layer disposed around the roller body, the absorbing layer having a plurality of micropores communicating with external environment; and a transfer layer disposed around the absorbing layer for transferring glue liquid to a coating roller, wherein the transfer layer is provided with a plurality of first through-holes, so as to allow impurities to enter the micropores in the absorbing layer. With the encapsulating glue film coating system, glue liquid can be uniformly applied onto the display panel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BOE TECHNOLOGY GROUP CO. LTD.; HEFEI BOE OPTOELECTRONICS TECHNOLOGY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jing, Yangkun Beijing, CN 57 90
Wu, Xing Beijing, CN 49 190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00