) spheres, having a face-centered cubic system (FCC)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9859497
SERIAL NO

15117313

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

he present invention relates to a method for manufacturing thin films consisting of SiO2 spheres of 250 nm in diameter, packed in a simple cubic structure and infiltrated with the organic luminescent polymer Poly[2-methoxy-5-(3′,7′-dimethyloctyloxy)-1,4-phenylene-vinylene] (MDMO-PPV). The thin film can be deposited onto a substrate of soda lime or indium oxide doped with tin (ITO). The manufacturing method includes the synthesis of a colloidal solution with the correct proportions of SiO2 spheres and a high-viscosity organic solvent and the subsequent treatment thereof by spin coating. The provided method makes it possible to obtain films having a controllable thickness and a good structural quality that can easily be attached as an active region in an organic light-emitting diode where, due to the film described herein, the emission of light produced by the active region is considerably improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PONTIFICIA UNIVERSIDAD JAVERIANACRA 7 # 40-62 BOGOTA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiménez, Borrego Luis Camilo Bogotá, CO 1 1
Méndez, Pinzón Henry Alberto Bogotá, CO 1 3
Salcedo, Reyes Juan Carlos Bogotá, CO 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00