Apparatus, device, and methods for mixing substances

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10104994
APP PUB NO 20160346746A1
SERIAL NO

15164863

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The subject matter described herein includes apparatus's and methods for storing and mixing materials such as powders and liquids. The mixing apparatus can comprise an impeller portion configured to rotate downward or upward within the main cup, wherein a movement of the impeller portion downward or upward is capable of mixing the contained set of substances, wherein the impeller portion comprises a set of propeller blades, and wherein the impeller portion is connected to a helical shaft portion comprising a first helical strand and a second helical strand wound uniformly in a parallel spiral configuration. The impeller portion facilitates a distributed mixing of the substances and the propeller blades are capable of removing deposits of the substance around the base of a main cup of the apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TITAN MIXER BOTTLE, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ali, Adan Columbus, US 2 9
Bowman, Fredrick Columbus, US 1 7
Bowman, Gered Columbus, US 2 9
Rage, Mohamed Columbus, US 2 9
Smith, Lonie Columbus, US 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00