Safe unloading and disposal of ionic liquid catalyst contaminated spent solids

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10052510
APP PUB NO 20160346816A1
SERIAL NO

14723113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Processes for shutting down a regeneration reactor and for removing spent solid from the regeneration reactor may comprise shutting off a feed comprising an ionic liquid to the regeneration reactor, cooling the regeneration reactor, removing at least a portion of the ionic liquid from the regeneration reactor, purging the regeneration reactor with N2 gas, introducing water into the regeneration reactor to form an acidic liquid in the regeneration reactor, and dumping the acidic liquid and the spent solid from the regeneration reactor. The acidic liquid may be neutralized with a basic liquid to provide a neutralized liquid. The spent solid may be separated from the neutralized liquid. In an embodiment, noble metal(s) may be recovered from the spent solid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEVRON U S A INC6001 BOLLINGER CANYON ROAD SAN RAMON CA 94583-0806

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harris, Thomas Van Benicia, US 10 21
Johns, Jeff William Draper, US 5 7
Timken, Hye Kyung Cho Albany, US 49 480

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00