Hydraulic system of construction machinery and method of controlling hydraulic system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10273660
APP PUB NO 20160348342A1
SERIAL NO

15108312

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a hydraulic system of construction machinery and a method of controlling the hydraulic system. The hydraulic system of construction machinery and the method of controlling the hydraulic system according to the present disclosure assign a weighted value for each operation, preliminarily distribute a (available torque that can be used) value that an engine can provide, through torque weighted values for each operation, and calculate surplus torque and deficient torque by comparing a preliminary distributable torque value to required torque. The surplus torque is provided for an operation in which torque is deemed to be deficient. Thus, the hydraulic system of construction machinery and the method of controlling the hydraulic system according to the present disclosure can sufficiently use available torque that can be used so that an operator can achieve a desired level of performance during the operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HD HYUNDAI INFRACORE CO LTD489 INJUNG-RO DONG-GU INCHEON 22502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Woo Yong Seoul, KR 16 43
You, Seung Bum Seoul, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00