Additive manufactured combustible element with fuel and oxidizer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10093592
APP PUB NO 20160355447A1
SERIAL NO

14729429

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustible element includes regions of fuel material interspersed with regions of oxidizer material. The element may be made by additive manufacturing processes, such as three-dimensional printing, with the fuel material regions and the oxidizer material regions placed in appropriate locations in layer of the combustible element. For example, different extruders may be used to extrude and deposit portions of a fuel filament and an oxidizer filament at different locations in each layer of the combustible element. The combustible element may define a combustion chamber within the element, where combustion occurs when the combustible element is ignited. The fuel material and the oxidizer material may be selected, and their relative amounts may be controlled, such that desired relative amounts of fuel and oxidizer are present for combustion with desired characteristics, such as combustion rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RAYTHEON COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Danforth, Jeremy C Tucson, US 26 89
Langhenry, Mark T Tucson, US 19 54
Perdue, Teresa Tucson, US 3 14
Summers, Matt H Marana, US 21 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00