Turbocharger and ship

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10066539
APP PUB NO 20160356206A1
SERIAL NO

15106238

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control unit controls a first power converter so as to make the speed of a motor/generator coincide with a prescribed speed command. A speed command (N*) set by an upper stream control system is inputted to a smoothing unit of the control unit. In the smoothing unit, the speed command (N*) is smoothed by a first-order lag element, and the rate of change is limited by a rate limiter to a prescribed value or less. For the speed command (Ns*) outputted from the smoothing unit, the difference (ΔN) from the actual speed (N) of the motor/generator is calculated in a difference calculator, a control command (S) based on this difference (ΔN) is generated in a control signal generator, and the first power converter is controlled on the basis of this control command (S). Fluctuations in the supply of power to the electric motor are thereby suppressed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI HEAVY INDUSTRIES LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ono, Yoshihisa Nagasaki, JP 25 192
Sakamoto, Musashi Tokyo, JP 16 42
Yamashita, Yukio Tokyo, JP 44 307

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00