Multi-destination packet handling at overlay virtual network tunneling endpoints

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9749221
SERIAL NO

14733264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a method provides for hosting, by a first virtual switch of an overlay virtual network, a multi-destination receiver for a multi-destination group. The first virtual switch receives, from a second virtual switch hosting a multi-destination sender for the multi-destination group, a single copy of a multi-destination packet, wherein the first virtual switch is represented by a node of a plurality of nodes in a tree created by a network controller, and wherein each of the nodes represents a virtual switch that has registered a multi-destination receiver with the network controller. The first virtual switch forwards the received multi-destination packet to a third virtual switch hosting a multi-destination receiver for the multi-destination group, wherein the third virtual switch is represented in the tree by a child of the node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Banavalikar, Bhalachandra G Cupertino, US 27 755

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00