Cooling system with direct expansion and pumped refrigerant economization cooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10254028
APP PUB NO 20160363359A1
SERIAL NO

15176559

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling system has both pumped refrigerant economization and direct expansion cooling. When outside air temperature is low enough that pumped refrigerant economization can provide enough cooling to satisfy cooling demand, only pumped refrigerant economization cooling is used to provide cooling. When outside air temperature is low enough that pumped refrigerant economization can provide some but not all of the cooling needed to satisfy cooling demand, the pumped refrigerant economization is operated at one hundred percent capacity and the direct expansion cooling is operated at a capacity to provide any supplemental cooling that is needed. If the outside air temperature is high enough that pumped refrigerant economization cannot provide any cooling, then only direct expansion cooling is used to provide cooling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • VERTIV CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dolcich, Benedict J Westerville, US 17 203
Lin, Zhiyong Dublin, US 50 208
Madara, Steven Dublin, US 6 99
Schutte, Daniel J Lewis Center, US 14 159
Sillato, Stephen Westerville, US 19 311

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 9, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 9, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00