Routing of nets of an integrated circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10452801
APP PUB NO 20160371418A1
SERIAL NO

14941579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A routing specification is received for nets of an integrated circuit connecting source cells and sink cells in the integrated circuit. A target performance parameter is received for each of the nets, the target performance parameters specifying a propagation property of electrical signals in the nets. Layouts of the nets are generated according to the routing specification. An actual performance parameter for each of the nets in the layouts is generated, in which the actual performance parameters specify a calculated actual propagation property of electrical signals in the nets. A deviation parameter is generated for each of the performance parameters. Each of the deviation parameters is indicative of a degree of deviation of the respective actual performance parameter from its target performance parameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beck, Manuel Kirchheim unter Teck, DE 11 24
Peyer, Sven Tuebingen, DE 25 239
Schulte, Christian Boeblingen, DE 13 23
Ziegler, Wolfram Holzgerlingen, DE 6 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00