Buck converter with changeable relationship between output voltage and duty cycle, and buck converting apparatus using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9780637
SERIAL NO

14881539

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A buck converter includes: a first input terminal; a second input terminal; a first output terminal; a second output terminal; an internal node; a first inductor, a second inductor and a main switch connected in series between the first input terminal and the internal node; a third inductor connected between the internal node and the first output terminal; a fourth inductor connected between the second input terminal and the second output terminal; a first auxiliary switch connected between the internal node and the second output terminal; and a second auxiliary switch connected between the second input terminal and the first output terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LITE-ON TECHNOLOGY CORP22F 392 RUEY KUANG ROAD NEIHU TAIPEI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiu, Huang-Jen Taipei, TW 22 78
Lin, Jing-Yuan Taipei, TW 36 176
Liu, Yu-Chen Taipei, TW 107 517
Lo, Yu-Kang Taipei, TW 21 80
Quang, Trong-Nha Taipei, TW 1 4
Tseng, Po-Jung Taipei, TW 10 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 3, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 3, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00