Gas sensor kit and gas measurement system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10151691
APP PUB NO 20160377532A1
SERIAL NO

15197205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a gas sensor kit and a gas measurement system in which a problem in arrangement of a signal processor and an atmospheric pressure sensor at the time of measuring a gas is solved. A gas sensor kit includes a sensor and a connector. The connector includes an atmospheric pressure sensor measuring an atmospheric pressure and a signal processor. The signal processor receives a measurement signal indicating a transmitted light quantity of a target gas from the sensor and obtains a measurement value of a concentration or a partial pressure of the target gas based on the measurement signal. The signal processor corrects the measurement value of the concentration or the partial pressure of the target gas by using an atmospheric pressure value measured by the atmospheric pressure sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NIHON KOHDEN CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dainobu, Hidetoshi Tokorozawa, JP 14 149
Inoue, Masayuki Tokorozawa, JP 213 1996
Sato, Takanori Tokorozawa, JP 136 1250
Tone, Katsuhide Tokorozawa, JP 6 44
Yoshifuku, Kazunori Tokorozawa, JP 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00