Multiple transaction data flow control unit for high-speed interconnect

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10078617
APP PUB NO 20160378710A1
SERIAL NO

15262415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, apparatus, and systems, for transporting data units comprising multiple pieces of transaction data over high-speed interconnects. A flow control unit, called a KTI (Keizer Technology Interface) Flit, is implemented in a coherent multi-layer protocol supporting coherent memory transactions. The KTI Flit has a basic format that supports use of configurable fields to implement KTI Flits with specific formats that may be used for corresponding transactions. In one aspect, the KTI Flit may be formatted as multiple slots used to support transfer of multiple respective pieces of transaction data in a single Flit. The KTI Flit can also be configured to support various types of transactions and multiple KTI Flits may be combined into packets to support transfer of data such as cache line transfers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORP.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blankenship, Robert G Tacoma, US 120 1211
Das, Sharma Debendra Saratoga, US 191 1591
Safranek, Robert J Portland, US 67 1472

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00