Mixer including foam feeding port, mixing method, and method for producing lightweight gypsum board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10668646
APP PUB NO 20170008192A1
SERIAL NO

15104093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Behavior of a flow of foam ejected to a gypsum slurry can be stabilized, and a relatively large amount of foam can be homogeneously or uniformly dispersed in the slurry. A mixer has a mixing area for preparing gypsum slurry, a slurry delivery section for delivering the slurry from the mixing area, and a feeding port for feeding foam to the slurry in the mixing area and/or the slurry delivery section under pressure. The slurry having the foam mixed therein is supplied to a production line for forming gypsum boards or gypsum-based boards. The feeding port is provided with a partition member dividing an ejecting region. The ejecting region is divided into a plurality of openings, which simultaneously eject the foam to the slurry.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YOSHINO GYPSUM CO LTDSHIN-TOKYO BLDG 3-1 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 100-0005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawamura, Toshiaki Tokyo, JP 13 209
Nanba, Kazuki Matsue, JP 1 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00