Process for producing a target formed of a sintering-resistant material of a high-melting point metal alloy, silicide, carbide, nitride or boride

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10344373
APP PUB NO 20170009335A1
SERIAL NO

15271372

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A target is formed of a sintering-resistant material of high-melting point metal alloy, high-melting point metal silicide, high-melting point metal carbide, high-melting point metal nitride or high-melting point metal boride comprising a structure in which a material formed of a sintering-resistant material of high-melting point metal alloy, high-melting point metal silicide, high-melting point metal carbide, high-melting point metal nitride or high-melting point metal boride and a high-melting point metal plate other than the target are bonded. A production method of such a target is provided. Further the generation of cracks during the target production and high power sputtering, and the reaction of the target raw material with the die during hot pressing can be inhibited effectively, and the warpage of the target can be reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON MINING HOLDINGS INC10-1 TORANOMON 2-CHOME MINATO-KU TOKYO 105-8407

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamakoshi, Yasuhiro Ibaraki, JP 32 334

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00