Real-time monitoring and automated intervention platform for long term operability of fuel cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10461347
APP PUB NO 20170012309A1
SERIAL NO

15200599

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, apparatuses, and systems for real-time monitoring and automated intervention of a power generation. Embodiments may include receiving operating data from components of the power generation system. A potential failure condition for the components may be determined from real-time operating data of the received operating data before an occurrence of the potential failure condition. An alert may be issued in response to determining the real-time operating data indicates a potential failure condition, and instructions for remedying the potential failure condition may be transmitted to the power generation system. An algorithm for determining whether the real-time operating data indicates the potential failure condition may be updated by using preceding operating data in response to detecting the potential failure condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLOOM ENERGY CORPORATION4353 NORTH FIRST STREET SAN JOSE CA 95134

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hall, Andrew Oakland, US 51 405
Miller, Brent Sunnyvale, US 14 312
Ramanan, Natarajan San Jose, US 18 758
Raut, Prasad Mumbai, IN 3 6
Shukla, Deepak Sunnyvale, US 183 2508
Vachhani, Pramod Bangalore, IN 4 72
Venkat, Aswin Belmont, US 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00