Power generating windbags and waterbags

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9698652
SERIAL NO

15270500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of using a bagged power generation system comprising windbags and water-bags for harnessing wind and water power to produce electricity to meet the escalating energy needs of mankind. Windbags integrated with aerodynamically shaped inflatable bodies filled with lighter-than-air gas: HAV, UAV, airplanes; enabling the apparatus to attain high altitude to capture and entrap high velocity wind. Water-bags integrated with hydrodynamic shaped bodies HUV, UUV, Submarine-boats; enabling the apparatus to dive, capture and entrap swift moving tidal-currents. Attached tether-lines pulling on the rotating reel-drums and generators to produce electricity. Active control surfaces, turbo-fans, propellers provide precision control of the apparatus. A system configured to maximize fluids capture, retention and optimized extraction of its kinetic energy. An extremely scalable and environmentally friendly method, system, apparatus, equipment and techniques configured to produce renewable green energy with high productivity and efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIA YIK HEIJOHOR BAHRU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sia, Yik Hei Johor Bahru, MY 32 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00