Crowbar current elimination

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9692414
APP PUB NO 20170012624A1
SERIAL NO

14793788

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, an inverter generates an inverted clock signal using (i) first P-type and N-type transistors connected in cascode between supply and ground nodes and (ii) control circuitry receiving different phase-offset input clock signals that ensure that the cascode-connected transistors are never even partially on at the same time, thereby preventing crowbar current from occurring through the cascode-connected devices. In one implementation, the control circuitry has two P-type transistors and two N-type transistors configured to receive three phase-offset input clock signals to prevent crowbar current in the inverter. The control circuitry has pass transistors that selectively allow one of the phase-offset input signals to be applied to the gate of one of the cascode-connected transistors with minimal delay, thereby enabling the inverter to operate properly over a relatively wide range of input clock frequencies.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LATTICE SEMICONDUCTOR CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miller, Edward Beaverton, US 17 228

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00