Methods and apparatus to optimize steam header blending and gas turbine loading in combined cycle power plants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10781723
APP PUB NO 20170022846A1
SERIAL NO

15210439

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and apparatus to optimize ramp rates in combined cycle power plants are disclosed herein. An example method disclosed herein includes predicting a first setpoint for a gas turbine in a combined cycle power plant over a prediction horizon and predicting a second setpoint for a steam generator over the prediction horizon. The example method includes identifying a first steam property of steam generated by the steam generator in the combined cycle power plant based on the second setpoint. The example method includes comparing the first steam property to a second steam property of steam associated with a steam turbine in the combined cycle power plant and dynamically adjusting at least one of the first setpoint or the second setpoint based on the comparison.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMERSON PROCESS MANAGEMENT POWER & WATER SOLUTIONS INC200 BETA DRIVE PITTSBURGH PA 15238

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adams, Jacob Nathaniel Zanesville, US 2 6
Cheng, Xu Pittsburgh, US 115 1867
Huff, Frederick Charles Pittsburgh, US 3 14
Rao, Ranjit Ramesh Gibsonia, US 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00