Power transmission belt

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10267380
APP PUB NO 20170023099A1
SERIAL NO

15301017

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power transmission belt and a method for manufacturing said belt. The belt includes: a backing layer made of a material with elastomeric behavior; a ventral layer made of a material with elastomeric behavior; a mechanical reinforcement means inserted between the backing layer and the ventral layer comprising a film with thermoplastic transformation surrounding the mechanical reinforcement means, said film comprising at least: a first component physically and/or chemically bonded to at least one component of the backing layer; a second component physically and/or chemically bonded to at least one component of the mechanical reinforcement means; and a third component physically and/or chemically bonded to at least one component of the ventral layer. The method for manufacturing said belt may advantageously use an anti-sticking means.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUTCHINSON75008 PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Franchini, Elsa Chalette sur Loing, FR 1 3
Rognon, Julie Saint Cyr sur Loire, FR 5 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00