Conveyance device for heat treatment device and heat treatment device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10260814
APP PUB NO 20170023304A1
SERIAL NO

15284747

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conveyance device for a heat treatment device presses a conveyed body to convey the conveyed body in a linear direction, and includes a cylinder mechanisms having a retractable rod that presses the conveyed body, in which: an abutting member is disposed at a tip part of the rod of the cylinder mechanism so that the abutting member abuts locations, which are different from each other in a circumferential direction, on an outer peripheral surface of the conveyed body; a guide rail configured to guide the abutting member is provided; and the abutting member is provided with a traveling roller that travels on the guide rail.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IHI CORPORATION1-1 TOYOSU 3-CHOME KOTO-KU TOKYO 135-8710
IHI MACHINERY AND FURNACE CO LTD3-3 TOYOSU 3-CHOME KOTO-KU TOKYO 135-6009

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isomoto, Kaoru Tokyo, JP 10 12
Katsumata, Kazuhiko Inuyama, JP 46 141
Nagata, Takahiro Kamo-gun, JP 74 647
Nakayama, Akira Hikari, JP 121 1294
Nishitani, Gen Kakamigahara, JP 9 10
Shimizu, Yuusuke Gifu, JP 28 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00