Stacked type semiconductor memory device and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871051
SERIAL NO

15059538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor memory device according to an embodiment, includes a stacked body, first and second semiconductor pillars and a contact. The stacked body includes insulating films and electrode films stacked alternately along a first direction. A configuration of an end portion of the stacked body in a second direction is a stairstep configuration. A step is formed in the stairstep configuration for each of the electrode films. The first semiconductor pillars are disposed in a region of the stacked body where the steps are not formed. The second semiconductor pillars are disposed in a region of the stacked body where the steps are formed. The contact is disposed on the electrode film for each of the steps. When viewed from the first direction, the first and second semiconductor pillars are disposed at some of lattice points of a lattice.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takahashi, Shinya Yokkaichi, JP 151 1600

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00