Device and method of controlling machine tool, to control synchronized operation of spindle axis and feed axis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10065255
APP PUB NO 20170028490A1
SERIAL NO

15217058

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controller for controlling a synchronized operation of spindle and feed axes. A spindle-axis control section includes an initial-motion control section for making a spindle axis perform an accelerated rotation at maximum capacity from a process start position; a maximum-acceleration detecting section for detecting a maximum acceleration of the spindle axis; a residual rotation-amount detecting section for detecting a residual rotation amount of the spindle axis; a current-speed detecting section for detecting a current speed of the spindle axis; a positioning-motion control section for making the spindle axis perform a decelerated rotation so as to reach the target thread depth after the accelerated rotation; and an overshoot detecting section for detecting an overshoot of the spindle axis during the decelerated rotation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FANUC CORPORATION3580 SHIBOKUSA AZA-KOMANBA OSHINO-MURA MINAMITSURU-GUN YAMANASHI 401-0597

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Morita, Yuuki Yamanashi, JP 67 125
Okita, Tadashi Yamanashi, JP 134 818
Tajima, Daisuke Yamanashi, JP 38 390

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00