System and method for augmenting consensus election in a distributed database

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10713275
APP PUB NO 20170032007A1
SERIAL NO

15200975

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one aspect, a distributed database system is configured to manage write operations received from database clients and execute the write operations at primary nodes. The system then replicates received operations across a plurality of secondary nodes. Write operation can include safe write requests such that the database guaranties the operation against data loss once acknowledged. In some embodiments, the system incorporates an enhanced arbiter role the enables the arbiter to participate in cluster-wide commitment of data. In other embodiments, the enhanced arbiter role enables secondary nodes to evaluate arbiter operations logs when determining election criteria for new primary nodes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MONGODB INC1633 BROADWAY 38TH FLOOR NEW YORK NY 10019

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Avitabile, Therese New York, US 4 52
Horowitz, Eliot New York, US 81 4168
Merriman, Dwight New York, US 26 2079
Michalski, Andrew Brooklyn, US 1 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00