Air gap contact formation for reducing parasitic capacitance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9786767
SERIAL NO

15294391

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A functional gate structure is located on a surface of a semiconductor material portion and including a U-shaped gate dielectric portion and a gate conductor portion. A source region is located on one side of the functional gate structure, and a drain region is located on another side of the functional gate structure. The source region and drain region both have a topmost surface that is above a topmost surface of the semiconductor material portion and another surface that touches a portion of the U-shaped gate dielectric. A contact structure is located on the topmost surface of the source region and/or the drain region. A middle-of-the-line air gap contact is located between the contact structure and the functional gate structure and above at least one of the source region and the drain region. The middle-of-the-line air gap contact is sealed by a portion of a conformal dielectric material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leobandung, Effendi Stormville, US 536 4756

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00