Power configuration method, user equipment, and base station

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9763204
SERIAL NO

15295852

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, a method includes, in response to a user equipment (UE) sending data to a first network side device over a first channel and to a second network side device over a second channel, determining that the first channel separately overlaps the second channel and a third channel. The method further includes allocating, according to priorities of the first channel and the second channel, first transmit power to the first subframe j and second transmit power to the second subframe i, where the first transmit power is less than or equal to a first power upper limit, where a sum of the first transmit power and the second transmit power is less than or equal to a first threshold, and where a sum of third transmit power of the third subframe i+1 and the first power upper limit is less than or equal to a preset second threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Qiang Shenzhen, CN 801 10809
Qu, Bingyu Beijing, CN 189 1869
Shao, Jiafeng Beijing, CN 84 230

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00