Hydraulic drive system for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9963856
SERIAL NO

15038179

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object to achieve favorable operability, in a combined operation that involves a specific actuator and involves a great difference in load pressure and when an operation of an operating unit for the specific actuator is a fine operation, by reducing energy consumption arising from wasted restricting pressure loss of a pressure compensating valve and by flexibly varying a flow rate of a hydraulic fluid supplied to the specific actuator depending on the load pressure. To achieve this object, a boom cylinder (3a) is provided with an open center type flow control valve (6a) that controls a hydraulic fluid from a main pump (202) and a closed center type flow control valve (6i) that controls a hydraulic fluid from a main pump (102). The main pump (102) is subject to load sensing control. The flow control valve (6a) is opened to control a supply flow rate up to an intermediate zone of an operating range of an operating unit for the boom cylinder (3a). Both the flow control valves (6a) and (6i) are opened to control the supply flow rate after the intermediate zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HITACHI CONSTRUCTION MACHINERY TIERRA CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mori, Kazushige Moriyama, JP 49 636
Nakamura, Natsuki Kouka, JP 24 114
Takahashi, Kiwamu Moriyama, JP 75 288
Takebayashi, Yoshifumi Kouka, JP 29 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 8, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 8, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00