Time-to-digital converter, frequency tracking apparatus and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9720380
APP PUB NO 20170038738A1
SERIAL NO

15331109

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present invention provide a time-to-digital converter, where the time-to-digital converter includes a delay unit, a first sampling unit, and a second sampling unit. The delay unit is connected to the first sampling unit and is configured to receive a first clock signal and delay the first clock signal; the first sampling unit is configured to perform sampling on the first clock signal and generate a first phase signal, so that a first phase-locked module adjusts a frequency of the first clock signal; the delay unit is further connected to the second sampling unit and is configured to receive a frequency-adjusted first clock signal and delay the frequency-adjusted first clock signal; and the second sampling unit is configured to perform sampling on the frequency-adjusted first clock signal and generate a second phase signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Song, Dongli Shenzhen, CN 1 3
Zhou, Shenghua Shenzhen, CN 16 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00