Conversion of strain-inducing buffer to electrical insulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9673302
APP PUB NO 20170040438A1
SERIAL NO

15295938

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Techniques are disclosed for converting a strain-inducing semiconductor buffer layer into an electrical insulator at one or more locations of the buffer layer, thereby allowing an above device layer to have a number of benefits, which in some embodiments include those that arise from being grown on a strain-inducing buffer and having a buried electrical insulator layer. For instance, having a buried electrical insulator layer (initially used as a strain-inducing buffer during fabrication of the above active device layer) between the Fin and substrate of a non-planar integrated transistor circuit may simultaneously enable a low-doped Fin with high mobility, desirable device electrostatics and elimination or otherwise reduction of substrate junction leakage. Also, the presence of such an electrical insulator under the source and drain regions may further significantly reduce junction leakage. In some embodiments, substantially the entire buffer layer is converted to an electrical insulator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cappellani, Annalisa Portland, US 54 2397
Cea, Stephen M Hillsboro, US 122 2774
Glass, Glenn A Portland, US 178 4407
Kuhn, Kelin J Aloha, US 88 2433
Le, Van H Portland, US 269 2810

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00