Galvanic element having solid-state cell stack

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10826128
APP PUB NO 20170040644A1
SERIAL NO

15299758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A galvanic element is provided having a solid-state cell stack containing a multiplicity of electrochemical solid-state cells stacked along a longitudinal axis in a housing. Each of the electrochemical solid-state cells has a stack including at least one anode layer, at least one cathode layer and at least one solid electrolyte layer arranged between the anode layer and the cathode layer. At least one of the electrochemical solid-state cells includes an elastically deformable compensation element, which at least partly compensates for a change in volume along the longitudinal axis of the stacked electrochemical solid-state cells. A method for producing such galvanic elements is also provided. Advantageous applications are found in vehicles and mobile devices including such galvanic elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lamp, Peter Landsberg am Lech, DE 12 43
Lupart, Saskia Munich, DE 5 12
Paschos, Odysseas Munich, DE 2 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 3, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00