Wiper motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10320265
APP PUB NO 20170047817A1
SERIAL NO

15337131

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wiper motor has: a magnet disposed on the yoke and formed with at least four poles; an armature disposed on an inner side of the magnet; a speed reduction mechanism unit having an output shaft for transmitting the rotation of the armature shaft; a gear housing connected to the yoke; a gear housing cover covering an opening of the gear housing; a magnet attached to the output shaft of the speed reduction mechanism unit; an absolute position detecting sensor disposed so as to face the magnet; and a control board having the absolute position detecting sensor attached thereto, the control board being disposed between the gear housing and the gear housing cover, and configured to control the rotation of the armature shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBA CORPORATIONKIRYU-SHI GUNMA 376-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amagasa, Toshiyuki Gunma, JP 34 163
Kanai, Takeshi Gunma, JP 32 319
Kimura, Masaaki Gunma, JP 63 812
Okabe, Hiroji Gunma, JP 7 37
Tanaka, Hiroto Gunma, JP 49 443
Tsuchiya, Koji Gunma, JP 44 296
Watanabe, Hachidai Gunma, JP 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00