System and method for multiphase flow measurements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9939418
SERIAL NO

15118833

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system, method and hydrocarbon processing facility for determining at least one parameter of a multiphase fluid (1) comprising hydrocarbons flowing in a conduit (2) of a hydrocarbon processing facility, which system comprises: said conduit; at least one coaxial measurement probe (3), which comprises at least one probe conductor, a probe shield (7) arranged outside of the at least one probe conductor, which at least one measurement probe is mounted to the conduit for measuring signals indicative of at least one physical property of the fluid- and comprises a first, open-ended terminal (8) where the at least one probe conductor and the probe shield are exposed to the flowing fluid when the system is in operation; and a signal processor (4) for interpreting the signals to determine the at least one parameter. The at least one measurement probe comprises a second terminal (9), and the system comprises a signal line (10) for conveying the signals from the at least one measurement probe to the signal processor, which signal line is connected to the at least one measurement probe at a predetermined position (P) in between the first terminal and the second terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FMC KONGSBERG SUBSEA AS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beilina, Larisa Mölndal, SE 1 2
Eriksson, Anders Göteborg, SE 216 2562

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00