Forming a gate contact in the active area

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10170583
APP PUB NO 20170054004A1
SERIAL NO

15244067

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a semiconductor device includes patterning a fin in a substrate; forming a gate between source/drain regions over the substrate, the gate having a dielectric spacer along a sidewall; removing a portion of the dielectric spacer and filling with a metal oxide to form a spacer having a first spacer portion and a second spacer portion; forming a source/drain contact over at least one of the source/drain regions; recessing the source/drain contact and forming a via contact over the source/drain contact; and forming a gate contact over the gate, the gate contact having a first gate contact portion contacting the gate and a second gate contact portion positioned over the first gate contact portion; wherein the first spacer portion isolates the first gate contact portion from the source/drain contact, and the second spacer portion isolates the second gate contact portion from the source/drain contact.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION; GLOBALFOUNDRIES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Kangguo Schenectady, US 3073 29638
Xie, Ruilong Schenectady, US 1423 10722
Yamashita, Tenko Schenectady, US 599 4956

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 1, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00