Lattice boom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10472213
APP PUB NO 20170057796A1
SERIAL NO

15239137

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a lattice boom in which a desired part can be reinforced after the lattice boom has been assembled and in which workability of the reinforcement can be improved. The lattice boom includes a plurality of main pipes, a plurality of lattice pipes, and a reinforcing part. The reinforcing part is provided on at least one of the outer circumferential surface of the main pipe and the outer circumferential surface of the lattice pipe. The reinforcing part is arranged between adjacent connecting parts among a plurality of connecting parts each connecting the main pipe and the lattice pipe. The reinforcing part includes a plurality of reinforcing members arranged along the circumferential direction of the pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL LTD )2-4 WAKINOHAMA-KAIGANDORI 2-CHOME CHUO-KU KOBE-SHI HYOGO 651-8585
KOBELCO CONSTRUCTION MACHINERY CO LTDHIROSHIMA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakashima, Yasuhiro Kobe, JP 45 308
Sato, Shinji Kobe, JP 201 2445

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00