Control flow graph analysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9921814
SERIAL NO

14833964

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and systems generate a control flow graph including an edge of the control flow graph from a branch instruction to a target address of the branch instruction in an abstract interpretation for an assignment instruction to a branch target variable of a program. The program allocates a particular branch target variable to a branch instruction having a plurality of branch targets. The branch target address is loaded from the branch target variable upon branching, a branch address of a branch instruction having one branch target as well as the address assigned by the assignment instruction to the branch target variable being determined as certain constant values determined by compiling the program. The target address assigned by the assignment instruction is added to an object of the abstract interpretation. A current abstract interpretation is terminated if the abstract interpretation reaches an instruction already subjected to the abstract interpretation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Copeland, Reid T Markham, CA 39 258
Koju, Toshihiko Tokyo, JP 17 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00