Semiconductor memory device and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9659957
APP PUB NO 20170062464A1
SERIAL NO

15046611

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a semiconductor memory device includes a first stacked body including a plurality of first electrode layers and a plurality of first insulating layers, the first electrode layers separately stacked each other, the first insulating layers provided between the first electrode layers; a second stacked body including a plurality of second electrode layers and a plurality of second insulating layers, the second electrode layers separately stacked each other, the second insulating layers provided between the second electrode layers, the second stacked body separated from the first stacked body in a first direction crossing a stacking direction of the first stacked body; and a first insulating portion provided between the first stacked body and the second stacked body, the first insulating portion provided integrally to the first insulating layers and the second insulating layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoyama, Kenji Yokkaichi, JP 42 320

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00