Wafer scale monolithic integration of lasers, modulators, and other optical components using ALD optical coatings

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9893489
SERIAL NO

15226149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

After forming a monolithically integrated device including a laser and a modulator on a semiconductor substrate, an anti-reflection coating layer is formed over the monolithically integrated device and the semiconductor substrate by an atomic layer deposition (ALD) process. The anti-reflection coating layer is lithographically patterned so that an anti-reflection coating is only present on exposed surfaces of the modulator. After forming an etch stop layer portion to protect the anti-reflection coating, a high reflection coating layer is formed over the etch stop layer, the laser and the semiconductor structure by ALD and lithographically patterned to provide a high reflection coating that is formed solely on a non-output facet of the laser.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leobandung, Effendi Stormville, US 536 4748
Li, Ning White Plains, US 707 4047
Plouchart, Jean-Oliver New York, US 18 177
Sadana, Devendra K Pleasantville, US 897 9891

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00