Semiconductor memory device and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9660076
APP PUB NO 20170069754A1
SERIAL NO

14944683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor memory device according to an embodiment includes a substrate, a plurality of conductive members containing a metal and provided on the substrate, a stacked body provided in each region between the conductive members, a semiconductor pillar piercing the stacked body, a memory film and internal stress films. The plurality of conductive members extend in a first direction and are separated from each other in a second direction. The internal stress films also extend in the first direction and are separated from each other in the second direction. The first direction and the second direction are parallel to an upper surface of the substrate and intersect each other. The internal stress films contain material having internal stress having the reverse polarity of internal stress of the metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iinuma, Toshihiko Yokkaichi, JP 48 841
Oshima, Yasunori Yokkaichi, JP 12 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00