Semiconductor storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10104806
APP PUB NO 20170071075A1
SERIAL NO

15062359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor storage device includes a substrate having a wiring, a first semiconductor memory, a terminal portion, a holder surrounding the terminal portion, a case, and a first plate-shaped member. The first semiconductor memory is disposed on a first principal surface of the substrate and is connected to the wiring. The terminal portion is connected to the substrate at a first end portion of the substrate and has a terminal connected to the wiring. The case houses part of the holder, the substrate, and the first semiconductor memory. Between the first principal surface and a first wall portion of the case facing the first principal surface, the first plate-shaped member is disposed. The first plate-shaped member is connected to the holder and the first principal surface on a second end portion side of the substrate, and has thermal conductivity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harashima, Shiro Sagamihara, JP 23 87
Hayakawa, Toshiyuki Yokohama, JP 31 189

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00