Controller for a multi-voltage on-board power supply system in a vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10618479
APP PUB NO 20170072881A1
SERIAL NO

15123615

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controller for a multi-voltage on-board power supply system in a vehicle is provided. The controller comprises a first control module which is connected via a first supply path to a first supply voltage connection of the controller and/or to a first ground connection of the controller in order to be supplied with current at a first supply voltage of the multi-voltage on-board power supply system and a second control module which is connected via a second supply path to a second supply voltage connection of the controller and/or to a second ground connection of the controller in order to be supplied with current at a second supply voltage of the multi-voltage on-board power supply system. The second supply path contains a switching module which is designed to selectively block the second supply path or switch the second supply path in a conductive state depending on a control signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BROSE FAHRZEUGTEILE GMBH & CO KOMMANDITGESELLSCHAFT BAMBERGBERLINER RING 1 BAMBERG 96052

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mijac, Anto Bamberg, DE 6 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00