System and method for making and applying a non-Portland cement-based material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10865146
APP PUB NO 20170073269A1
SERIAL NO

15344062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for applying a construction material is provided. The method may include mixing blast furnace slag material, geopolymer material, alkali-based powder, and sand at a batching and mixing device to generate a non-Portland cement-based material. The method may also include transporting the non-Portland cement-based material from the mixing device, through a conduit to a nozzle and combining the transported non-Portland cement-based material with liquid at the nozzle to generate a partially liquefied non-Portland cement-based material. The method may further include pneumatically applying the partially liquefied non-Portland cement-based material to a surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EN-TECH CORPORATION91 RUCKMAN ROAD CLOSTER NJ 07624

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benz, Robert George Cranford, US 9 20
Camali, Eugene James Bellair Shores, US 11 20
Schrell, Andreas Hofheim, DE 41 207

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00