Additive manufactured thermoplastic-aluminum nanocomposite hybrid rocket fuel grain and method of manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822045
SERIAL NO

15275423

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid rocket solid fuel grain having a cylindrical shape and defining a center port is additive manufactured from a compound of thermoplastic fuel and passivated nanocomposite aluminum additive. The fuel grain comprises a stack of fused layers, each formed as a plurality of fused abutting concentric circular beaded structures of different radii arrayed defining a center port. During operation, an oxidizer is introduced along the center port, with combustion occurring along the exposed port wall. Each circular beaded structure possesses geometry that increases the surface area available for combustion. As each layer ablates the next abutting layer, exhibiting a similar geometry is revealed, undergoes a gas phase change, and ablates. This process repeats and persists until oxidizer flow is terminated or the fuel grain material is exhausted. To safety achieve this construction, a fused deposition additive manufacturing apparatus, modified to shield the nanocomposite material from the atmosphere is used.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jones, Ronald D Indialantic, US 25 350

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00