Fluid pressure control device for construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10145391
APP PUB NO 20170074292A1
SERIAL NO

15120773

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid pressure control device for a construction machine includes a first circuit system connected to the first pump; a second circuit system connected to the second pump; a switching valve having a normal position, a straight traveling position and a merging position where the working fluid of the branch section is merged into the second neutral passage; and an open/close mechanism configured to open/close the first neutral passage. In a case where at least one of the control valves, on which merging is required, on the downstream of the second traveling control valve is switched to a position other than the neutral position, by closing the first neutral passage by the open/close mechanism and switching the switching valve to the merging position, the working fluid of the first pump is merged into the working fluid of the second pump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KYB CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Shunsuke Kanagawa, JP 16 241
Yoshida, Nobuyoshi Tokyo, JP 37 274

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 4, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 4, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00